Ductwork replaced and reworked in place
Runs taken out and rebuilt to the same line, or reworked where something in the building has changed — with the host unit checked once it is reconnected.
Out with the old run, in with the new
Ductwork that has corroded, been damaged or simply outgrown the space gets removed and rebuilt. Where the route still works we keep it and re-use the line; where it does not, we set a new one and agree it with you.
Existing services, ceilings and finishes are worked around rather than stripped out wholesale.
Taken out, checked, rebuilt
Two jobs in one: getting the old run out cleanly, and putting the new one back to a line that works.
Removing the old run
The existing ductwork comes out in sections, with the route re-checked while it is open.
- Old duct and fittings removed in manageable sections
- Route and access re-checked once the void is open
- Reusable components identified before anything is reordered
- Removals taken away as part of the job
Building the new run
New sections are made to the sizes the space needs and installed to the same line.
- New duct made to size and installed to the agreed line
- Joints sealed and supports fixed back to the fabric
- Terminals and connections set level and square
- Air-tightness checked before the system goes back into use
Reworking a run that is already there
Sometimes the ductwork is fine and the building around it has changed. Extensions, new branches and moved outlets are added to the run that exists.
Extending and re-branching
New branches, extended runs and relocated terminals tied back into the existing system.
- Routes extended and new branches tied into the existing duct
- Dampers added where a new branch has to be balanced
- Terminals moved and re-set to the new layout
- Airflow re-balanced once the changes are complete
Checked once it is reconnected
Whichever way the run changes, the unit at the end of it gets re-checked before we call the job done.
- Plant connections re-made and sealed after the change
- System run with the unit on and checked against the new layout
- Airflow confirmed at the terminals that were altered
- Any remaining imbalance reported to you, not left silent
Old run out, new run in, unit checked before we leave.
Replacement and modification questions
What people ask before a run gets opened up.
- Can one section be replaced, or does the whole run have to come out?
One section is often enough. Once the duct is open we can see how far the corrosion or damage actually goes, and we tell you before replacing more than needs replacing. - Will the system be out of use while the work is going on?
The run being worked on is out of use while it is open. Where a building has more than one system we sequence the work so the property keeps ventilation. - Who decides where a new branch goes?
You do. We suggest a position based on the structure and the air the space needs, then set it where you want it and confirm the change before cutting.
Got a run that needs replacing or moving?
Tell us what has changed and we will look at the route, quote the work and re-check the unit once it is back together.